Title: What Team 8 has Experienced
Throughout the past few months, our team learned several valuable life lessons. Lessons such as teamwork, technical skills and critical thinking.
To start off the project, team 8 divided into three groups: Architecture, Construction, and engineering. Each group was given responsibilities and tasks to be accomplished. Strong teamwork was established through the works of RFI (Request for Information) and individuals making up for what others lack (such as knowledge in different fields.)
Additionally our team gained insight on the fields of architecture, construction and engineering through field visits and the expertise from the team mentors. Our mentors provided valuable expertise to help our design challenges. Some field visits we have done are the visit to Snohetta to learn about the architectural field. They specialized in the usage of wide open spaces in their libraries to attract people around it, thus we thought of using that too for our renovation. As for construction, we visited the offices of structure tone and the construction site of Elmhurst Library. The visits gave us an idea of how to design the structure for our library. In addition Sergio Silviera provided us with valuable engineering information on how to attract people to libraries through the use of luring materials such as glass.
One of the most important lessons we learned was problem solving. Some problems we faced: how to expand the current library to the required size, who and where to gather and organize information. In the end, through research and critical thinking as a group we were able to come up with solutions to our project.
SOMEONE PLEASE POST THIS ONTO THE BOARD, TY
From Michael Ding, Brandon and Carina Acosta
Monday, March 10, 2014
Site Selection
Reading is one of the important building blocks to shaping our future. The town of Bakersfield, California has the lowest literacy rate in America. Our objective in renovating the Rathbun Branch library was to attract more of the community. We also wanted to provide them with a more enjoyable place to read, and more access to reading material. The current library contains 7,000 square feet, while the renovated building will be increased to 33,000 square feet. In order to meet the needs of the future population (based on the 2020 Kern County master plan) the library needs to expand to at least four times its current size. We acquired the adjacent land next to the parking lot for current parking with additional spaces.
Nicole, Nancy, Leo
Nicole, Nancy, Leo
Top 14 Xeric plants in Bakersfield, California
http://www.bhg.com/gardening/gardening-by-region/southern-california/top-native-plants-of-southern-california/
Building Materials Overview
Roof
After
researching a variety of different roofing types the team selected a roofing
membrane made up of several layers including a liquid applied waterproofing,
drainage mat, filter fabric, and ballast. The color is a light color ballast
which helps reduce the heat island effect. It is directly adhered to the structural slab.
Concrete
Our
team realixed that concrete was the ideal choice for several conditions. In
addition to the steel reinforced concrete gradebeams and spreadfootings for our
foundations,we used 4" thick poured concrete over a 6" thick
foundationfor all sidewalks.
The
exterior stone walking surface is made up of granite stone slabs, while the
exterior wall and canopy are made with pressed precast concrete panels in
rain-screen cavity wall assembly, and an anti-graffiti coating.
Glazing
The team selected variety of different glazing
types to meet the needs of our renovated library. Throughout the exterior skin of
the building our curtain wall on the first and second wall utilized an
insulated glazing unit assembly made up of an outer lite of ¼” heat strengthened
glass ; 0.06" polyvinyl butyral interlayer sandwiched with another ¼” heat
strengthened glass followed by ½” air gap and an inner lite made up of a single
3/8” heat strengthened tempered piece of
glass. All exterior glass has a costume color digital printed ceramic frit on
its surface along with a Low-E coating. Our skylight uses the same IGU
assembly.
For
interior windows the team used a laminated glass assembly featuring a 0.06"
polyvinyl butyral interlayer sandwich between two ¼” thick heat strengthened pieces
of glass.
The
spandrel/ opaque glass panels assemblies are to match with the
insulated glazing unit.
Landscape
The
planting beds are Gallum ordatum and sweet woodruff.
Metals
The enameled
steel are heavy galvanized enameled steel sheets which go behind the main
information and circulation desk.
Ceilings
We
have variety types of ceiling for this project. In the readings acoustic wood
fiber panels 2” thick, 2’-3/4” by 12’ were used in other areas such as the meeting
room we used 2’ by 4’ acoustical square tiles on exposed tee grid in other area
we suspened 5/8” gypsum wall board. In areas such as the mechanical room we
exposed the underside of the structural slab.
Flooring
For
the different types of spaces the team used several different types of
flooring. These different types of flooring were selected.The cafe and
elevators have rubber flooring while kids and teen room has carpets.
Sunday, March 9, 2014
Saturday, March 8, 2014
Subscribe to:
Posts (Atom)